Sprinkler piping is usually the last system to find space above the ceiling, and that is where it runs into ducts, beams, cable trays and light fixtures. ScanM2 builds Revit fire protection models – sprinkler heads, branch lines, mains, risers, valves, standpipes and fire pump equipment – so the system can be coordinated with structure and other MEP trades before anyone cuts pipe on site.

Contact Us Now for a Free Consultation!

We model new fire protection systems from the layout prepared by your fire protection engineer or designer, and we model existing systems from 3D laser scans of the building. The second part is where our background helps: 3D laser scanning is our core work, so we can capture mains, risers and valve assemblies in occupied buildings and turn them into an accurate as-built model for retrofits, tenant improvements and renovation projects.

What We Model

ComponentWhat is included in the model
Sprinkler headsPendent, upright, sidewall and concealed heads placed to the design layout, with type, orientation and elevation
Branch lines and cross mainsPipe sizes, slopes where specified, fittings, outlets, drops and sprigs
Feed mains and risersMain routing, riser locations, floor control assemblies, test and drain connections
Valves and devicesControl valves, check valves, alarm valves, dry pipe and pre-action valve assemblies, flow and tamper switch locations
Standpipes and hose connectionsStandpipe risers, hose valves and fire department connections
Fire pump and water supplyFire pump, jockey pump, controllers, backflow preventers, tanks and connection to the water service
Hangers and supportsHanger and support locations where they are needed for coordination
AnnotationPipe tags, sizes and elevations, head and valve schedules on sheets

Wet, dry, pre-action and deluge systems are modeled with the components shown in the design documents. We use native Revit fire protection systems and families with correct pipe connectors, so the model can be scheduled, filtered by system and exported to coordination software. If your project needs specific manufacturer content, we can build it as part of our Revit family creation services.

Who Does the Design, and What We Do

Fire sprinkler design – system type, hazard classification, head spacing and hydraulic calculations – is the responsibility of the fire protection engineer of record or the licensed sprinkler designer, working to NFPA 13 and the local code. ScanM2 does not replace that role. We build the BIM model from the engineer’s layout and calculations, keep pipe sizes and head positions as designed, and flag any conflict we find during coordination so the designer can decide how to resolve it.

This split keeps responsibilities clear: the engineer owns the design, and we make sure the design fits the building in 3D.

New Design or Existing Systems From Laser Scans

New construction. We convert 2D fire protection drawings, CAD plans or a design-intent Revit model into a detailed model that can be coordinated with the rest of the building. Architectural and structural models are linked so ceiling heights, beam depths and shafts are respected.

Existing buildings. In retrofits, tenant improvements and system upgrades, the existing sprinkler mains and risers are rarely shown correctly on old drawings. We scan the building with FARO terrestrial laser scanners (typical accuracy ±2–3 mm), register the point cloud and model the existing fire protection system together with the structure and other services that limit new routing. Scanning can be done in occupied buildings, floor by floor or area by area, so normal operations are not interrupted.

The result is an as-built model that shows where existing pipes really are – including elevations above ceilings and in mechanical rooms – so the new design can tie in at the right points. We do not have local offices: our team travels quickly to any US state, or works remotely from your own point clouds. More about this workflow on our point cloud to BIM and as-built MEP drawings pages.

Coordination With Structure and Other MEP Trades

Fire protection piping must keep clearances from ducts, cable trays, plumbing, lighting and structural members, and sprinkler heads must not be blocked by obstructions. We link the fire protection model with architectural, structural, HVAC, plumbing and electrical models and check the routing in Revit and Navisworks.

  • conflicts between mains and ductwork, beams and other piping are found and reported with clear viewpoints;
  • head positions are checked against ceiling grids and lighting layouts;
  • routing changes are made in agreement with the designer and other trades;
  • the coordinated model is exported as NWC/NWD for your coordination meetings.

For whole-building coordination see our MEP BIM coordination services and BIM clash detection services. Related disciplines: Revit plumbing design, Revit mechanical design and electrical BIM services.

Level of Development

The level of development is agreed per project, based on how the model will be used.

LODTypical use for fire protection
LOD 200Approximate mains and riser locations for early space planning
LOD 300Mains, branch lines and heads at designed sizes and positions for design coordination
LOD 350Adds hangers, valve assemblies and interfaces with other systems for detailed coordination
LOD 400Fitting-level detail for detailing and as-built documentation, where the project requires it

Most fire protection coordination models are produced at LOD 300–400. If you work to a BIM execution plan, we follow its LOD definitions and naming.

What We Need From You

  • fire protection drawings or the design layout (DWG, PDF or Revit), with hydraulic calculation results or pipe sizes if available;
  • architectural, structural and other MEP models or drawings for coordination;
  • your Revit version, template, BIM execution plan and family standards, if you have them;
  • for existing systems: access to the building for laser scanning, or your existing point cloud (E57, RCP/RCS or other common formats).

If information is missing or unclear, we send a list of questions before modeling.

What You Receive

DeliverableDetails
Revit modelRVT in your Revit version, fire protection systems separated and named per your standards
Coordination filesNWC/NWD exports for Navisworks, clash reports with viewpoints when coordination is in scope
Open BIM.ifc export for teams using other software
2D drawingsDWG/PDF plans, sections and riser diagrams generated from the model
SchedulesSprinkler head, valve and pipe schedules from the model
Point cloud (existing buildings)Registered point cloud in E57 or RCP for reference

How a Fire Protection BIM Project Works

  1. Review. We review the design documents, existing models or scan requirements and agree the scope, LOD and deliverables.
  2. Laser scanning (existing buildings). We scan the areas where the existing system must be captured and register the point cloud.
  3. Modeling. We build the fire protection model from the design layout or the point cloud, using your template and standards.
  4. Coordination. We link other discipline models, run clash checks and resolve routing with the designer and other trades.
  5. Quality check. Pipe sizes, connections, systems and annotation are checked against the source documents before delivery.
  6. Delivery and updates. You receive the agreed files; design changes can be incorporated as the project develops.

Who This Service Is For

  • Fire protection contractors – coordinated models and drawings that show the system in the context of the building, ready for detailing and installation planning.
  • MEP engineers – fire protection modeled alongside HVAC, plumbing and electrical so the whole MEP package is coordinated.
  • General contractors – a fire protection model that can join the federated coordination model with the other trades.
  • Building owners and facility managers – as-built models of existing fire protection systems for renovations, upgrades and long-term maintenance planning.

Fire protection modeling is part of our wider Revit MEP BIM services, Scan to BIM and Revit BIM modeling work.

FAQ

What is fire protection BIM modeling?
It is the creation of a 3D Revit model of a building’s fire protection system – sprinkler heads, branch lines, mains, risers, valves, standpipes and fire pump equipment – so it can be coordinated with structure and other MEP systems and used to produce drawings and schedules.
Do you design sprinkler systems or perform hydraulic calculations?
No. System design and hydraulic calculations are done by the fire protection engineer of record or licensed sprinkler designer, to NFPA 13 and local code. We model the system from their layout and pipe sizes and report any conflicts we find during coordination.
Can you model an existing sprinkler system?
Yes. We laser scan the building with FARO scanners (typical accuracy ±2–3 mm) and model the existing mains, risers, branch lines and valve assemblies from the point cloud. This is useful for retrofits, tenant improvements and system upgrades where old drawings are not reliable.
Can you scan an occupied building?
Yes. Scanning is planned area by area or floor by floor, so tenants and operations can continue. Our team travels to any US state; we can also work from a point cloud you already have.
Which LOD do you model fire protection to?
The LOD is agreed per project. Coordination models are typically LOD 300–400; early planning models can be LOD 200. We follow the LOD definitions in your BIM execution plan if you have one.
Do you coordinate fire protection with other trades?
Yes. We link architectural, structural, HVAC, plumbing and electrical models, check clashes in Revit and Navisworks and resolve routing with the designer and other trades. Clash reports are delivered with viewpoints.
Which file formats do you deliver?
Revit RVT, NWC/NWD for Navisworks, .ifc, and DWG/PDF plans, sections and riser diagrams, plus schedules from the model. For existing buildings we can also deliver the registered point cloud.
What do you need to start?
Fire protection drawings or the design layout, models or drawings of the other disciplines, and your Revit version and standards. For existing systems we need access to the building for scanning, or your existing point cloud.