BIM Services in Sacramento, CA

BIM Services in Sacramento, CA

ScanM2 provides BIM services in Sacramento, CA for architects, MEP engineers, contractors and building owners. We build Revit models of existing buildings from our own laser scans, from your point cloud, or from CAD files, PDFs and paper plans, and then keep the model useful through design: MEP and fire sprinkler modeling, custom families, clash checks and drawing sheets. Models built from our scans follow the typical building scan accuracy of ±2–3 mm.

Contact Us Now for a Free Consultation!

There is no ScanM2 office in Sacramento. Our crew travels to sites in the city, the rest of Sacramento County and neighboring counties, and the modeling is done by our own team. If your project only needs a model of a building, without design-stage support, our page on Scan to BIM in California explains that service.

What Will the Model Be Built From?

The source decides how far you can trust each element. We state the source in the model so that your team knows which walls were measured and which were traced from an old sheet.

What you haveWhat we doHow reliable the result is
Nothing but the buildingFARO laser scan, registered point cloud, Revit modelMeasured geometry of everything visible
Your own point cloud (E57, RCP, LAS)Check coverage and registration, then modelAs good as the scan; gaps are reported before modeling
DWG drawingsCAD to BIM modeling with walls, levels and openingsFollows the drawings, including their mistakes
PDF or paper plansPDF to Revit conversion, paper sheets digitized firstGood for layout; heights and hidden changes need checking
Old drawings plus a partial scanScan the areas you will change, trace the restMeasured where it matters, traced elsewhere

For a renovation, the last option is often the sensible middle ground. The rooms, roof and mechanical spaces you will touch are scanned; floors that stay as they are can come from drawings.

BIM Support at Each Project Stage

A model of an existing building is not a one-time file. It changes as the design develops. Here is what we add at each stage and what your team uses it for.

StageWhat we model or produceWhat your team does with it
Feasibility and space planningShell, floors, cores, columns, ceiling heights, roofTest layouts, check areas and clear heights
Schematic designExisting model split into phases: existing, to be demolished, newShow options to the owner, compare demolition volumes
Design developmentExisting MEP in the work zones, structure that new work touchesRoute new systems, size openings, plan shafts
Construction documentsPlans, sections and elevations set up as sheets from the modelAdd the design, annotations and specifications
Coordination before constructionClash checks between your new design and the existing modelFix conflicts in the model instead of on site
HandoverRoom data, equipment tags, a cleaned model in RVT and .ifcKeep records for facility management

The design itself, calculations and stamped sheets stay with your licensed architect and engineers. We supply measured geometry, modeling and drafting support. For choosing the level of detail per stage, see our article on BIM level of detail.

Sacramento Projects Where BIM Helps

Gas-to-electric conversions in existing buildings

The City of Sacramento adopted its Existing Building Electrification Strategy in May 2024. It is part of the Climate Action and Adaptation Plan, which includes a measure to transition natural gas in existing buildings to carbon-free electricity by 2045.

Whatever the timing for a given building, a conversion study starts with the same questions: where is the gas equipment, how big is the electrical service, and where can new heat pumps, panels and conduits go. A model answers the geometric part:

  • boilers, furnaces, water heaters and rooftop units with their clearances;
  • gas piping that is visible in mechanical rooms and on the roof;
  • main electrical panels, switchgear rooms and available wall space;
  • roof area, parapets and existing curbs for new outdoor units;
  • shafts and ceiling voids that could take new ducts or refrigerant lines.

Your MEP engineer decides on equipment, loads and the electrical upgrade. The model shows where it can physically fit.

Tenant improvements with sprinkler changes

The City’s plan preparation guidance says automatic fire extinguishing system plans are required for remodels and tenant improvements where walls or ceilings are added, removed, relocated or modified. Before the fire protection designer starts, it helps to know where the existing heads, branch lines and mains actually are. We scan above the ceiling where tiles can be lifted and model visible piping and heads. See fire sprinkler BIM modeling. The sprinkler design and hydraulic calculations remain with the fire protection contractor or engineer.

Local design criteria your engineers will apply

The City publishes its design criteria: climate zone 12, seismic design category D for commercial buildings, rainfall values for roof framing and roof drains, and a note that many areas of Sacramento contain expansive soil. These values are applied by your engineers, not by the model. What the model can do is give them accurate inputs:

Engineering questionWhat the model contributesWhat it cannot contribute
Energy upgrade in climate zone 12Window sizes, wall and roof areas, room volumesU-values, insulation, compliance calculations
Seismic or structural reviewVisible columns, beams, braces, slab edges, measured spansRebar, connections hidden by finishes, material strength
Roof drainage changesRoof slopes, drains, scuppers, gutters, parapet heightsPipe sizing and flow calculations
Foundation questionsFloor levels and visible cracks as captured on scan daySoil conditions; those come from a soils report

What Goes Into a Sacramento BIM Model

We agree on a list of elements before modeling. A short example of how such a list looks:

  • Architecture: walls with measured thickness, doors, windows, stairs, ramps, ceilings, roof, fixed casework.
  • Structure: visible columns, beams, joists, braces, slabs and foundations where exposed.
  • Mechanical: air handlers, rooftop units, fans, main and branch ducts in the scanned zones.
  • Plumbing and gas: visible piping, water heaters, fixtures and floor drains.
  • Electrical: panels, switchgear, cable trays and main conduits as objects.
  • Fire protection: sprinkler mains, branch lines, heads, risers and valves where visible.
  • Site: paving, curbs, steps and trees near the building if requested.

For system-level detail, see MEP BIM services.

Families, templates and standards

Generic Revit families are fine for walls and doors, but equipment and special windows often need their own. We create custom Revit families when the standard library does not match what was scanned. If your office has a Revit template, naming rules, shared coordinates or a BIM execution plan, send them before we start. We work in your Revit version and can export .ifc for teams using other software.

Clash checks between new and existing

Once your design is placed in the existing model, conflicts appear quickly: a new duct through an existing beam, a sprinkler main below the new ceiling line. We run clash detection between the disciplines you choose and return a list of conflicts with views. Resolving them is a design decision for your team.

Limits of a Model of an Existing Building

  • A scan records visible surfaces. Pipes in walls, framing behind drywall and rebar are not in the scan.
  • Closed ceilings are modeled as ceilings unless tiles can be lifted on scan day.
  • Elements traced from old drawings carry the drawings’ errors; we mark them separately.
  • A model is not a boundary survey, a structural assessment or an energy compliance report.

Example Scope: Two-Story Office Planned for Electrification

This is an illustration of how a request can be written, not one of our projects.

  1. Building: two-story office in Sacramento, about 24,000 sq ft, gas boiler and rooftop units.
  2. Scan: both floors, the mechanical room, the electrical room and the roof; ceiling tiles lifted along main corridors.
  3. Model: architecture and structure for both floors; mechanical, gas piping and electrical equipment in the scanned zones.
  4. Phasing: existing equipment tagged for possible removal.
  5. Files: Revit model, .ifc export, point cloud in E57, and floor and roof plans in DWG and PDF.
  6. Not included: load calculations, equipment selection and the electrical service design.

Where We Work Around Sacramento

We travel to sites in Sacramento and nearby cities such as West Sacramento, Elk Grove, Roseville, Folsom, Rancho Cordova and Davis, as well as unincorporated Sacramento County. For scan-only work, see 3D scanning in Sacramento and 3D scanning in Stockton. If you need 2D drawings rather than a model, see as-built drawings in Sacramento. Statewide options are on our BIM services in California page.

Need the existing building modeled first? See Scan to BIM services in Sacramento.

FAQ

What do your BIM services in Sacramento include?
Revit modeling of existing buildings from our scans, your point cloud or your drawings, plus design-stage support: MEP and sprinkler modeling, custom families, clash checks, phased models and drawing sheets from the model.
Can you build a model from paper plans or PDFs only?
Yes. We digitize the sheets and model from them. The result follows the drawings, so we recommend scanning at least the areas that will change.
Can you help with a gas-to-electric conversion study?
We model the existing equipment, gas piping, electrical rooms, roof and shafts. Equipment selection, loads and the electrical design are done by your MEP engineer.
Do you design sprinkler systems?
No. We model the existing sprinkler piping and heads that are visible. The fire protection designer prepares the new layout and calculations.
Can you work in our Revit template and standards?
Yes. Send the template, naming rules, shared coordinates and any BIM execution plan before modeling, and tell us your Revit version.
How accurate is a model built from your scan?
Typical building scan accuracy is ±2–3 mm. Models traced from drawings are only as accurate as those drawings.
Will the City accept your model for a permit?
We do not submit permit applications or stamp drawings. Your architect or engineer uses our model as the existing-conditions base for the permit set.
Do you have an office in Sacramento?
No. Our crew travels to sites in Sacramento and the surrounding counties, and the modeling is done by our own team.

What to Send Us

  1. Address, building type and approximate floor area.
  2. What you have: drawings, PDFs, paper sets or a point cloud.
  3. The project stage and what the model must support.
  4. Disciplines needed and areas to include.
  5. Revit version, template and BIM standard, if any.
  6. Site rules: hours, escorts, roof and ceiling access.

We will reply with a proposed source for each area (scan or drawings) and a list of modeled elements. For projects outside the region, see our BIM modeling services in the USA.

Contact Us Now for a Free Consultation!

We work in cities all over the world